Optimization Design and Application Study of Super Gearcasting Box Beam Tang Lihua L iu ChanghangTang Lihua: Engineer,Major Bridge Engineering Bureau of Railway Ministry,Wuhan 430 0 5 0 ,ChinaPre- stressed concrete box beam with continuous rigid frame structure is the load- carrier of Geheyan groove.The concrete of its bos beam is castsuspendedly by huge gear,based on the case,this paper briefly introduces the essentials,procedure and applicaion of the whole construction plan.The plan is optimized and applied successfully,itcould be referred to by other similar projects.box beam; suspending cast; design optimization; study on application